Project #11 Resurface Streets and Roads in the Town of St. George


Resurface streets and roads in and adjacent to the Town of St. George. Total length of resurfacing: 6.68 miles.

PROJECT COMPLETED

 

ROAD NAME MILES
S-18-111 ABBOTT 0.16
S-18-38 ARLINGTON 0.09
S-18-697 AZELEA 0.18
S-18-582 BRYANT 0.21
S-18-44 CAROLINA 0.36
S-18-110 CEDAR 0.40
S-18-633 CENTRAL 0.19
S-18-107 GAVIN 0.12
S-18-41 JOHNSTON 0.17
S-18-583 MAPLE 0.08
S-18-102 MCCLURE 0.22
S-18-109 MURRAY 0.25
S-18-104 N. RAILROAD 0.17
S-18-39 RAYSOR/HUDSON 1.41
S-18-663 SCHOOL 0.18
S-18-167 SUGAR HILL 3.8
S-18-42 WHITRIDGE 0.24