Project #8 Old Orangeburg Road (Road S-18-22)
Widening Orangeburg Road (Road S-18-22) from existing 20-foot pavement to 24 feet. Resurfacing from Dorchester Road (SC Route 642) to
US 78. Intersection improvements at Road S-18-35. Total length: 8.39 miles.
Phase 1 - From US 78 to Mallard Drive - COMPLETED
Phase 2 - From Mallard Drive to US 17A - COMPLETED
Phase 3 - From US 17A to Dorchester Road - Plans completed. ON HOLD
PRE-CONSTRUCTION